How to build a tunnel with Play Dough (Rock Cycle)

Home > Blog  > How to build a tunnel with Play Dough (Rock Cycle)

What is a tunnel?

 

STUMPHOUSE MOUNTAIN TUNNEL (Walhalla) - 2023 What to Know BEFORE You Go

Tunnels are underground roads built to improve traffic . A tunnel boring machine is using used to improve the process of drilling through rock with an alternative to drilling and blasting methods.

pThe tunnel boring machine for the Scarborough Subway Extension.

In this activity, we will use science and engineering skills to build a tunnel with play dough and PVC!

We first have to plan the construction of the tunnel by answering questions such as:

  • The purpose of the tunnel
  • The location of the tunnel
  • How it will make people’s lives easier
  • How we can make the tunnel aesthetically pleasing

Materials 

  • PVC pipes
  • Toilet paper or paper towel rolls
  • Paper
  • Tape
  • Glue
  • Paint
  • 10 Popsicle sticks
  • Five 10 cm lengths of wire or pipe cleaner
  • Cardboard square, at least 20cm square (for a student working surface)
  • Clay (~ 15cm x 12cm)
  • Plastic spoon
  • Pencil or wooden dowel
  • Rulers
  • Water
  • Weights or heavy objects to use as weights (such as books)
  • Make model clay mountains (mounds) that are ~ 12cm high by 15cm in diameter. Place each mountain on a piece of cardboard. Make enough for one per group.

Play Dough & Cardboard Tubes | Learning 4 Kids

On Day 1,  Design the procedures for boring rock out of the mountain, and build the tunnels.

On Day 2, test the tunnels by 1) pouring water over the mountains to test for cracks or openings, and 2) applying weight to test the tunnels for structural strength.

Day 1-Tunnel Design

Design and create model tunnels through clay mountains

  • Make model clay mountains that are 12 cm high by 15 cm in diameter
  • Place each mountain on a piece of cardboard.
  • Tunnel dimensions: the tunnel must measure at least 4 cm wide by 6 cm high and go completely through the mountain.
  • Use the Tunnel engineering design learned in rock cycle
  • As an engineer, you are called to use the least amount of materials to complete your tunnel, for cost effective. You have to estimate the volume of materials removed from the mountains by forming the remains into a shape that you can calculate the volume of (sphere, cylinder, cube)
  • Ensure that the tunnel is insulated properly to avoid leaks
  • Study the environmental impacts by assessing if the tunnel change the structure of the mountain

 

Day 2-Tunnel Testing

Test the tunnel structures for cracks (by pouring water over their structure while at a sink or over a large basin) and structural strength (by placing weights or heavy books on their mountain top).

 

Iconic Great Smoky Mountains tunnel to undergo major repairs | Raleigh News & Observer

No Comments

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Discover more from Budding Genius Central Mississauga

Subscribe now to keep reading and get access to the full archive.

Continue reading